Shoal Lake Cree Nation

APPROVED JVLP VENTURE

EV Charging Network

The EV Charging Network is an Indigenous-led electric-vehicle infrastructure venture focused on underserved highway corridors, community hubs, host-site partnerships, and turnkey charging deployment, beginning with a Highway 55 regional focus.

Structure
Shoal 357 + Quantum JVLP
Sector
Clean transportation
First corridor in view
Highway 55

No charging station is open

As of November 2026, this venture is at the planning stage. No location has been announced, built or switched on. Do not plan a trip around charging at Shoal Lake Cree Nation or along Highway 55 on the strength of this page.

Current status

The status label is kept with the venture record, so it changes here the moment it changes there. Open the record for the stage note, the governance source and the one-page brief.

THE MODEL

Two pathways

The venture is designed around two complementary pathways.

The first is developing and operating approved public charging locations of its own.

The second is supporting others — First Nations, municipalities, businesses, property owners, destination sites and public organizations — with charging-site planning, funding coordination, utility engagement, engineering, installation, commissioning, operations, and maintenance.

SERVICE AREAS

What the venture is designed to do

  • Host-site assessment and partnership development
  • Utility coordination and capacity review
  • Charging-site planning and engineering coordination
  • Permitting and construction coordination
  • Level 2 and fast-charging deployment
  • Commissioning and network activation
  • Charger monitoring and uptime management
  • Operations and maintenance coordination
  • Funding-program support and compliance administration
  • Site connectivity and physical security through Two Feathers Technology Services, where approved
  • Local maintenance and technical training through Forward Path Training, where approved

HIGHWAY 55

The first corridor in view

Initial planning focuses on gaps affecting Highway 55 and connected regional travel. That is a planning focus, not a list of sites.

Specific sites, route coverage, host agreements, construction dates, utility capacity, charger types, pricing, and commissioning status are published only after they are verified and approved. Until then, this page names none of them.

Suitable host sites may include First Nation-owned properties, corridor retail locations, hospitality sites, municipal facilities, public destinations, commercial properties, fleet locations, and community hubs.

LOCATION STATUS

How a charging location will be labelled

When locations are published, each one carries exactly one of these labels. Only an operational location is ever shown as available.

Before anything is built
  • Exploratory — a possible location is being looked at.
  • Host discussion underway — the venture is talking with the site's owner.
  • Utility feasibility underway — the power supply is being checked.
  • Funding application submitted — an application has been made; funding is not confirmed.
  • Design and permitting — engineering and permits are in progress.
  • Procurement — equipment and contractors are being selected.
While it is being built and switched on
  • Construction — the site is being built. You cannot charge there.
  • Commissioning — the equipment is being tested and approved. You cannot rely on it yet.
When you can use it
  • Operational — the charger is approved, connected and open to the public. This is the only label that means you can charge.
  • Temporarily unavailable — an operational site is out of service for now.
  • Retired — the site has been permanently closed.
What a host site involves

Every host opportunity requires site control, a utility review, a safety analysis, engineering, commercial terms, and written approval. Sending an inquiry starts a conversation; it does not reserve a charger or commit either side.

Safety and investment boundary

Charging deployment is subject to utility capacity, engineering, permits, electrical safety requirements, procurement, funding, host agreements, equipment availability, and commissioning. Public information is not an offer of securities, a guarantee of construction, or a promise of financial return.